Zero-Carbon industrial Park | 6.4MW PV Projects Successfully Connected to the Grid

Source: Tianxi Release Time: 2024-12-24 Views: 78 Share:

Recently, the 6.4 MW PV projects invested by Tianyu, a technology subsidiary of Tianxi Group, was successfully connected to the grid.


With the serious challenge of global climate change and the deepening of the concept of sustainable development, the new energy policy is like a spring breeze, leading industrial parks towards a greener and low-carbon future. Tianxi actively responds to the call for new energy, taking the application of energy facilities such as pv, power storage and charging station as opportunities to apply visual digital intelligence to the comprehensive energy management of the park. Tianyu provides one-stop energy solutions for enterprises, which optimize the energy structure, improve the self-sufficiency rate of energy. Those solutions reduces the operation cost on the one hand, and inject a strong impetus for the green and sustainable development of enterprises on the other hand.

 

1-2.gif


Project Overview 


3.jpg

Hefei High-Tech Zone Huoqiu Modern Industrial Park 2.4MW PV Project


The total installed capacity of the project is 2.4 MW, and it is expected that the project will generate 59.17 million kWh of electricity in 25 years, with an average annual power generation of about 2.37 million kWh. This project has brought significant energy-saving and emission reduction benefits to the park, which is equivalent to saving more than 18,046 tons of coal, and reducing more than 16,093 tons of carbon dust.


4.jpg

 Hanxing Integrated Energy 4MW PV Project (Phase I of 2MW)


The total installed capacity of the project is 4MW (Phase I of 2MW). It is expected that the project will generate a total of about 98.22 million kWh of green power in 25 years, with an average annual power generation of up to 3.93 million kWh. It saves a lot of energy consumption for the enterprise, which is equivalent to saving more than 29,956 tons of coal, and reduces the emission of more than 26,715 tons of carbon dust.


 Working Together - Winning the Future


5.jpg


In the face of the profound changes in China's energy structure, the importance of energy supply and the application of alternative energy in contemporary industrial parks has become increasingly prominent. From the installment of solar photovoltaic panels to the construction of power storage stations, and from the popularization of electric vehicle charging stations to the establishment of smart grids, every step is cohesive with our persistent pursuit of a green and low-carbon future. We are accelerating the application of new energy technologies, driven by scientific and technological innovation, so that clean energy can become a strong driving force for the development of the industrial parks.


In the future, Tianxi will continue to work in the field of green energy, cooperate with partners and jointly promote the construction of low-carbon industrial parks and the green transformation of enterprises to offer high-quality energy solutions, so as to contribute to the construction of a clean, beautiful, and sustainable world.